Sunday, September 26, 2010

September 27 - October 1

DP 1 - Expressive Hands - Project Objectives: Create a 18x24 drawing of hands made through direct observation of expressive poses. Use a dip pen to create a composition with visual movement. There must be more than 5 hands. Craftsmanship counts.

  • Monday: Absolutely last day to work on your tool project in class. Drawing Technqiues Quiz. VVJournals are due.
  • Tuesday: Introduce expressive hands and review outline contours. Discuss project guidelines.
  • Wednesday: Tool drawing techniques are due. Composing the final composite will be discussed. Continue working on hand drawings.
  • Thursday: Continue working hand drawing. Introduce journal entries for contour project.
  • Friday: Work on hand drawings or journal entries.


Homework Assignment: This is the homework assignment we have never completed. Make a 15 minute drawing  of your hand holding a pair of scissors each day. Write the date and beginning and ending times. Use pen. Due on Monday, October 4.


Journal Assignment: Create three double page spreads about contour lines. One spread should be a drawing of a public place or environment, like a classroom. The second spread should be a space you share with someone else, like your table you work at or eat at. The third spread should be a space where only you spend time, like your backpack or your locker. All pages must be created in pen line and completed in color using watercolor, tissue paper, or pastels.

_______________________________________________
DP 3 - Studio Project - Self-Portrait in bridging a connection to your artist research. Begin with charcoal and gesso washes. Project due on Monday, October 4th.

Sunday, September 19, 2010

September 20-25

DP 1 - Unit 1 Studio Project - A Well-Composed Composite of Drawing Techniques of the Same Object
  • Monday: Review the expectations for the studio project and due date. Work on Studio Project.
  • Tuesday: Discuss journaling assignments and demo in class on journaling expectations.
  • Wednesday - Friday: Work on studio projects and journal assignments. Studio Project is due on Friday at the end of class.

DP Weekly Homework: Beginning on Wednesday evening, make a 15 minute drawing  of your hand holding a pair of scissors each day. Write the date and beginning and ending times. Use pen. Due on Tuesday, September 28.


Journal Assignments Changes from the original assignment sheet:

  1. Make Technique pages using all of the following mini-labs you have created in class. (use as many pages as necessary)
Stippling Sphere
Outline Contour
Value Collage Sphere
Cross-contour object
Hatching object
Cross-hatching sphere in pencil
Cross-hatching sphere in pen
Hi-contrast object
·       Make a main title and label each technique.
·       For each technique include a reflection statement about what worked and what didn’t with the technique. Leave yourself some information to look back on.

  1. Object Research (full page or bleed)
·       Research your tool online. Find out who made, how it is used, and when was it invented.
·       Make a title.


_______________________________________
DP 3 

Journal Assignment: you should be finishing up your research for your journal pages. Journal should be completed by Friday, Sept. 24.
Studio Project Assignment: Assignment will be handed out in class and due date set.
Home Project: Assignment will be handed out and due dates set. Students will also have to find an artist who has completed this type of painting as a reference.

Sunday, September 12, 2010

September 13 - 17

DP 1 - Unit 1 Studio Project - A Well-Composed Composite of Drawing Techniques of the Same Object
  • Monday: Work on cross-hatching in pencil and pen and the value collage sphere.
  • Tuesday: All techniques are due - outline contour, stippling, cross-contour, hatching, cross-hatching in pencil, cross-hatching in pen, and value collage are all due. High-contrast will be introduced.
  • Wednesday: Work on journal assignments. 
  • Thursday: Composition Power Point. Begin drawings for final composite piece.
  • Friday: Work on composite pieces and journal pages.
DP Weekly Homework: Beginning on Wednesday evening, make a 15 minute drawing  of your hand holding a pair of scissors each day. Write the date and beginning and ending times. Use pen. Due on Tuesday, September 21.

____________________________



DP 3 Students --
First Studio project, home project, and journal assignments are due on Tuesday, September 14.

DP1 Homework - due Tuesday, September 14

Make four drawings of your foot in a shoe with laces. Each drawing needs to be 15 minutes long, write the beginning and ending time as well as the date for each drawing. Use pen.

Sunday, September 5, 2010

September 7 - 10

DP 1 - Unit 1 Studio Project - A Well-Composed Composite of Drawing Techniques of the Same Object
  • Tuesday: Review techniques so far - outline contour, stippling, cross-contour, and hatching. Begin cross-hatched value sphere in pencil.
  • Wednesday: Work on cross-hatched value sphere in pen.
  • Thursday: Begin value strips for a value collage using ink washes.
  • Friday: Work on Journal Assignments.
DP Weekly Homework

____________________________


DP 3 Students --
  • Studio Project - Due Date for the Weird Perspective Drawing is Thursday, September 9th.
  • VVJ Assignment - Due Date for the 5 pages on your favorite color is Thursday, September 9th.
  • Homework Assignment - Due Date is Tuesday, September 14th.